Case Study: Fifth Elevation
Manufacturing and supplying secret fix copings, corners and relevant accessories for use on an MOD site.
Hampshire-based commercial & industrial roofing specialists, Fifth Elevation, reached out to HJA fabrications to manufacture and supply our Secret Fix coping system to an MOD site located in the South of England.
Watch The Installation Video
Key Considerations For MOD Sites
Due to the sensitive nature of this project, details have been made deliberately ambiguous, however, it is important to note that the core aim for infrastructure on all MOD sites is as follows:
Infrastructure is a key enabler of Defence capability, the vision for which remains: Infrastructure that is optimised, affordable and supports our Defence capabilities, outputs and communities both now and in the future.
Ministry of Defence: Building Performance Standards
With this in mind, it was clear that our partners at Fifth Elevation needed a solution that was robust, efficient and effective to meet the rigorous demands of an MOD facility.
View The Gallery
Supplying A Secret Fix Aluminium Coping System
HJA’s secret fix coping system was the natural choice for Fifth Elevation’s project for a number of reasons:
- Anti-Rattle functionality
- Wind-tested to 144mph
- The coping itself delivers a clean visual line that is watertight (due to there being no bolts on the system)
- Super quick installation
- Strong aluminium
- Clip on installation
- Prevents cold bridging
- Exceptional weatherproofing capability
- Low maintenance
All these benefits (and more) combined, ensure a durable, long-term solution for the end-client.
The ease of installation can be seen in the below video – which the team at Fifth Elevation filmed to demonstrate its simplicity.
Results
We partner with a variety of roofing and cladding companies and work hard to maintain positive relationships with them. The team over at Fifth Elevation are no exception and were very pleased with the finished result.
Their team of installers were able to fit approx. 30 meters of the secret fix coping system in a few hours, making for an efficient, high-quality solution.